Gold Member Since 2014
Audited Supplier
Zhong Xin Te Packaging Machinery Co., Ltd.

Inflatable Air Bag, Dunnage Bag, Air Bag manufacturer / supplier in China, offering 80*180cm Two Layers Safety Brown Container Pillow and Dunnage Bag, Safety Products of Paper Edge Board, 100*100corner Guard/ Paper Angle Board and so on.

(/ )

Supplier Homepage Product Paper Products 80*180cm Two Layers Safety Brown Container Pillow and Dunnage Bag

80*180cm Two Layers Safety Brown Container Pillow and Dunnage Bag

FOB Price: US $2.2 / Piece
Min. Order: 500 Pieces
Min. Order FOB Price
500 Pieces US $2.2/ Piece
Get Latest Price
Production Capacity: 20ton
Transport Package: Carton
Payment Terms: L/C, T/T, Money Gram, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: 80*180cm
  • Scope of Application: Container and Transporation
  • Layer: Multi Layer
  • Pringting: Single Color/ Two Colors/ Four Colors
  • Seal: Heating
  • Dimension: Various
  • Brand: Stm
  • Logo Printing: Available
  • Specification: FREE OPTION
  • HS Code: 48194000
  • Material: Kraft Paper
  • Color: Brown
  • Funcation: Protection
  • OEM: Acctable
  • Pattern: Pneumatic
  • Package: Carton
  • Size: Customized
  • Trademark: STM
  • Origin: China Suzhou
Product Description
PRODUCT NAME

DUNNAGE BAG/ CARGO AIR BAG/ INFLATABLE AIR BAG/ CARGO SECURING DUNNAG BAG



Loading Tips:
Clean the floor of the trailer and inspect floors, walls and roof for nails or holes before loading.  Remove or hammer down nails or other sharps.
Load skids tight from front to back and from side to side.  Tight means touching.
Use side shifters on the fork lift to position freight in firm contact with the sidewall or other skid of freight.  Also to control void size.
Alternate the void from side to side to balance the load.
Put tallest freight in the nose at the first load position and bag it.
Put the most fragile freight towards the nose for the softest ride.
Use additional bags when necessary to stabilize unsteady skids.
Always bag when dropping from two high to one high loading.
Always bag the final load position.
Techniques for Easy Installation:
Insert inflation tool into valve.
Visually locate the best void to install the bag while walking in.
Give the bag a small puff of air to give it some stiffness and bulk.
Insert bag all the way into the void before inflating. Valve should be at top if possible. One hand should be on the inflation tool and one hand should be positioning the bag.
If bagging a high load position, you may tape the bag to the top of one unit before loading the other side.
When inflating, watch the freight not the bag. 1 – 3 lbs psi recommended. When the freight is tight against the wall, disengage the inflator. Don't worry, the bag will not over-inflate!  Installation is complete when the inflator blows back. 
After inflation, screw on over-cap.
Deflation (Patented walk-away feature):
Remove over-cap, push valve in and twist one quarter turn clockwise.
You can walk-away while bag deflates!
Remove bag, inspect for damage and set aside for reuse.
OUR PRODUCTION RANGE

SIZE    (cm)

MATERIAL(cm)(Mpa)
050*100
PE/PP+KRAFT250.06≤3.5T
050*150
PE/PP+KRAFT250.06≤3.5T
060*100
PE/PP+KRAFT280.06≤3.5T
060*120
PE/PP+KRAFT280.06≤4.5T
060*150
PE/PP+KRAFT280.06≤4.5T
080*120
PE/PP+KRAFT380.06≤4.5T
080*160
PE/PP+KRAFT380.06≤4.5T
080*180
PE/PP+KRAFT380.06≤4.5T
090*120
PE/PP+KRAFT450.06≤4.5T
090*180
PE/PP+KRAFT450.06≤4.5T
100*120
 PE/PP+KRAFT500.06≤4.5T
100*160
 PE/PP+KRAFT500.06≤4.5T
100*180
PE/PP+KRAFT500.06≤4.8T
100*200
 PE/PP+KRAFT500.06≤4.8T
100*220
PE/PP+KRAFT500.06≤4.8T
100*240
PE/PP+KRAFT500.06≤4.8T
120*120
PE/PP+KRAFT600.06≤4.8T
120*180
PE/PP+KRAFT600.06≤4.8T
120*200
 PE/PP+KRAFT600.06≤4.8T
120*220
 PE/PP+KRAFT600.06≤4.8T
120*240
 PE/PP+KRAFT600.06≤4.8T
Send your message to this supplier
Avatar
Miss Ann
Manager
*From:
To: Miss Ann
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now